Roofing estimate template, with a filled example

Guide · Estimates, quotes and follow-upMcGuire Flanigan · Updated November 24, 2026 · 10 min read

A roofing estimate template should list your license details, the customer and address, measured and ordered squares, pitch, tear-off layers, a decking allowance priced per sheet, underlayment, flashing, ventilation, dumpster, permit, the manufacturer warranty tier, exclusions, payment terms and an expiration date. Price each as its own line so homeowners can compare bids.

A roofing estimate template needs nine parts: your company and license details, the customer and property, measured squares with a waste factor, pitch and access, tear-off layers, a priced line list (decking allowance, underlayment, flashing, ventilation, dumpster, permit), the manufacturer warranty tier, exclusions, and payment terms with a signature line and an expiration date.

Below is the template as a table you can copy into a document or spreadsheet, a fully filled example for a full replacement, and the reasoning behind each line so the estimate holds up when a homeowner compares it to two others.

What should a roofing estimate include?

Homeowners usually get more than one roofing bid and lay them side by side. The estimate that wins is rarely the cheapest one. It is the one where the homeowner can see what they are paying for and can't find a hole. Every roofing estimate should answer these questions without a phone call:

  • How big is the roof? Squares measured, waste percentage, and the number of slopes.
  • What comes off? How many layers of old roofing are being torn off and hauled away.
  • What happens if the wood is bad? A decking allowance priced per sheet, so rot found mid-job is not a surprise argument.
  • What goes on? Underlayment, ice and water barrier, drip edge, flashing, vents, shingles by brand and line.
  • Who stands behind it? The manufacturer warranty tier and your own workmanship warranty, in writing.
  • What is not included? Gutters, skylights, fascia, gas vents and anything else people assume is covered.
  • How and when do I pay? Deposit, progress or completion payment, and how long the price holds.

Roofing estimate template (copy this)

Each row is one field. The third column shows the kind of entry that belongs there. Keep the field order: it follows the way a homeowner reads.

FieldWhat to enterExample
Company blockBusiness name, address, phone, email, contractor license number and stateSummit Line Roofing, License #000000 (example)
Estimate number and dateA unique number, the date written, and the date the price expiresRE-2611-042, written Nov 24, valid 30 days
Customer and propertyOwner name, phone, email, property address, and who you met on siteDana Ruiz, 418 Alder Court
Roof measurementsTotal squares measured, waste percent, squares ordered, number of slopes, measurement source29.0 measured, 10% waste, 32 ordered, 6 slopes, aerial report plus tape check
Pitch and accessPitch of each main slope, stories, and access problems (fences, pools, landscaping)7/12 main, 10/12 front gable, two story, pool on back side
Tear-offNumber of existing layers and material typeOne layer of 3-tab asphalt
DeckingWhat is included and the price per extra sheet of replacement deckingInspect all decking, 3 sheets included, extra sheets $X each
Underlayment and barriersUnderlayment type, where ice and water barrier goes, drip edgeSynthetic field, barrier at eaves and valleys, new drip edge
FlashingStep, counter, chimney, valley, pipe boots: new or reusedNew step flashing at two walls, new chimney counter flashing
VentilationIntake and exhaust plan, vents removed and addedRidge vent 38 lf, remove 4 box vents, keep soffit intake
Roofing systemShingle brand, product line, color, starter, hip and ridgeArchitectural shingle, color per customer
DisposalDumpster size and number of hauls, magnet sweepOne 30-yard dumpster, magnetic nail sweep daily
PermitWho pulls the permit, fee, and inspection(s)Contractor pulls, fee passed through at cost
WarrantyManufacturer warranty tier by its exact name, and your workmanship warranty termManufacturer enhanced tier, 10-year workmanship
Line itemsItem, quantity, unit, unit price, line totalSee the filled example below
OptionsUp to three choices with their own totalsStandard, upgraded, premium system
ExclusionsEverything not in the priceGutters, skylights, fascia and soffit repair
Payment termsDeposit, balance due point, accepted payment methods, financing if offeredDeposit at signing, balance at final inspection
ScheduleEstimated start window and days on site, weather noteStart within 3 weeks, 2 days on site
Required noticesAny notice your state requires (see the state rules section)Lien notice, cancellation notice
SignaturesCustomer signature, date, chosen option, your signatureOption B accepted

Roofing estimate example (filled out)

Example only. The company, customer and every price below are made up to show the format. Use your own material costs, labor rates and markup. This is a full replacement on a two-story home with one existing layer.

Summit Line Roofing (example). Estimate RE-2611-042 for Dana Ruiz, 418 Alder Court. Measured 29.0 squares, 10 percent waste, 32 squares ordered. Main slopes 7/12, front gable 10/12. One layer of 3-tab to remove. Valid for 30 days.

Line itemQtyUnitUnit priceTotal
Tear-off and haul one layer, 3-tab29square$75$2,175
Steep and two-story adder (10/12 gable)6square$40$240
Decking allowance, 7/16 OSB (3 sheets included)3sheet$85$255
Synthetic underlayment29square$22$638
Ice and water barrier, eaves and valleys210lf$4.50$945
Drip edge, new184lf$3.25$598
Step flashing at sidewalls48lf$9$432
Chimney counter flashing, rebuilt1each$450$450
Pipe boots, replaced3each$45$135
Ridge vent, cut in38lf$11$418
Remove box vents and patch deck4each$35$140
Architectural shingles, starter, hip and ridge, installed32square$310$9,920
Dumpster, 30-yard, one haul1each$550$550
Building permit (passed through at cost)1each$225$225
Total, Option B$17,121

Extra decking beyond the 3 included sheets: $85 per sheet, photographed before replacement and shown to the owner the same day. Excludes gutters, skylight replacement, fascia and soffit repair. Deposit due at signing, balance due when the final inspection passes.

How to write a roofing estimate, line by line

Squares and waste

A roofing square is 100 square feet of roof surface. Write down both numbers: squares measured and squares ordered. The gap between them is your waste factor, and it grows with hips, valleys and dormers. A simple gable might need around 10 percent; a cut-up hip roof needs more. Showing both numbers stops the homeowner from thinking another bidder's lower square count means a smaller roof.

Pitch and access

Pitch changes labor and safety setup. Record the pitch of each main slope, not just the steepest, and add a separate steep or two-story line instead of burying it in the shingle price. Note access problems too. A pool, a fenced yard or a glass sunroom under the eave changes how you stage the dumpster and protect the property.

Tear-off layers

Count the layers at an edge or a vent cut and write the number on the estimate. A second hidden layer doubles the debris and the labor, and it is the most common reason a roofer's crew calls the office mid-job. If you could not confirm the layer count, say so and state the price per square for each extra layer.

Decking allowance

You can't see the decking until the shingles are off, so price it as an allowance: a set number of sheets included and a fixed price for each extra sheet. Promise photos before replacement. This line prevents more disputes than any other on a roofing estimate.

Underlayment and ice barrier

Name the underlayment type and say exactly where ice and water barrier goes: eaves, valleys, around penetrations, or the full deck. Your local code and the shingle manufacturer's instructions set the minimum, so write what you are installing rather than "per code."

Flashing

Say whether each flashing type is new or reused: step flashing at walls, counter flashing, chimney, valleys and pipe boots. Reusing old flashing is a judgment call, and homeowners deserve to know which call you made.

Ventilation

Write the intake and exhaust plan: soffit or edge intake, ridge vent or box vents, and anything you are removing. Mixing exhaust types on the same roof can work against itself, so explain the change in one sentence on the estimate. Check the shingle manufacturer's ventilation requirements too, since they can affect the warranty.

Dumpster and disposal

List the dumpster size, the number of hauls you expect, and the daily magnetic sweep. Homeowners worry about nails in the driveway more than they say.

Permit

State who pulls the permit, what it costs and whether an inspection is required before the final payment. Passing the fee through at cost on its own line is cleaner than hiding it.

Manufacturer warranty tier

Shingle manufacturers sell enhanced warranty tiers above their standard limited warranty, and the higher tiers usually require a credentialed installer, specific accessory products and registration. Write the tier by its exact manufacturer name, list the components it requires, say who registers it, and keep your own workmanship warranty on a separate line so nobody confuses the two. Check the current terms in the manufacturer's warranty document before you quote; they change.

Common roofing estimate mistakes

  • One lump sum. A single price for "new roof" invites the homeowner to assume everything is included.
  • No decking price. Without a per-sheet price, every rotten sheet becomes a negotiation on the roof.
  • "Per code" instead of specifics. It reads as a dodge and it gives the homeowner nothing to compare.
  • No expiration date. Material prices move. A price with no end date gets accepted six months later.
  • Warranty confusion. Mixing the manufacturer's material warranty with your workmanship warranty in one sentence.
  • Exclusions left out. Gutters and skylights are the usual surprise.

How to present roofing estimate options

Most homeowners choose better when they see three versions of the same roof than when they get one take-it-or-leave-it price. Build the options from the same measurements so the only differences are the ones you chose. Our three-tier quote guide walks through how to build the tiers. For roofing, the differences usually fall here:

What changesOption A: standardOption B: upgradedOption C: premium
Shingle lineEntry architecturalMid-line architecturalDesigner or impact-rated line
Ice and water barrierEaves and valleysEaves, valleys, penetrationsFull deck
VentilationReplace existing ventsRidge vent conversionRidge vent plus added intake
WarrantyStandard limited warrantyEnhanced manufacturer tierTop manufacturer tier
Workmanship5 years10 yearsLongest you offer

Present the middle option first and explain what the customer gives up in Option A. Do it at the kitchen table or on a short video call, not by emailing a PDF and hoping. If the estimate is tied to an insurance claim, keep the scope aligned with the adjuster's line items and attach the photo set; our roofing insurance claim photos checklist covers what to shoot.

What state rules may require on a roofing estimate

Rules depend on your state and sometimes your county, so check with your licensing board and an attorney before you finalize the form. This is not legal advice. Two examples show the kind of thing that can apply:

If your estimate becomes the contract once signed, it has to carry these notices. Many roofers keep a separate contract page and attach the estimate to it.

How to follow up on a roofing estimate

A roofing estimate that goes out and never gets a second touch is a marketing cost with no return. The follow-up should be specific to what the homeowner asked about on the roof, not "just checking in." Our guide to following up on unsold estimates lays out a weekly sweep. A simple cadence for roofing:

  1. Same day: send the estimate with a two-line summary of the option you recommended and why.
  2. Day 2 or 3: answer the question they raised on site (ventilation, the chimney, the gable) with a photo.
  3. Day 7: a call, not a text. Ask what they are comparing against.
  4. Day 21: remind them the price expires on the date shown and offer to re-measure if needed.
  5. After a storm: a short note to open estimates in the affected area.

If you send more than a handful of estimates a week, the follow-up is the part that slips. Automating estimate follow-up covers how drafts can be prepared for a person to approve and send.

Template, spreadsheet or roofing software?

ToolFits whenWatch out for
Document template (this page)A few estimates a week, one estimatorMath errors and old prices copied forward
SpreadsheetYou want formulas for squares, waste and totalsVersions multiply; nobody knows which file was sent
Roofing CRM estimate toolSeveral estimators, measurement reports, follow-up trackingMonthly cost and setup time; the template still decides the quality

Once the job is done, the estimate turns into the invoice. Our contractor invoice template carries the same line items through to billing.

Where Cortex fits

A template fixes what the estimate says. It does not fix the estimates that sit unanswered in your CRM. Cortex builds agents inside the roofing software you already run that watch for quiet estimates, draft a follow-up that references the actual job, and queue it for a person on your team to approve. Nothing goes to a homeowner without that approval. If you only send a few estimates a week, the cadence above on a calendar may be all you need. If you want to see where estimates are leaking in your own pipeline, start with the free AI operations audit, or see how we work with roofing companies.

AI for roofing companies

Sources

  1. 01Learn About Home Improvement Contracts, Contractors State License Board (California)
  2. 02Florida Statutes 713.015, Mandatory provisions for direct contracts, The Florida Senate

Questions operators ask

What should a roofing estimate include?

Company and license details, the customer and address, squares measured and ordered, pitch, tear-off layers, a decking allowance with a per-sheet price, underlayment, flashing, ventilation, dumpster, permit, the manufacturer warranty tier, exclusions, payment terms, an expiration date and signature lines.

How do you calculate squares for a roofing estimate?

One square is 100 square feet of roof surface. Divide the measured roof area by 100 for squares measured, then add a waste factor for hips, valleys and cuts to get squares ordered. Show both numbers on the estimate.

How should decking be priced on a roofing estimate?

As an allowance: include a set number of replacement sheets in the price and state a fixed price for each extra sheet, with a promise to photograph damaged decking before replacing it.

How long should a roofing estimate be valid?

Many roofers use 30 days because material prices change. Whatever you choose, print the expiration date on the estimate so an old price can't be accepted months later.

Is a roofing estimate the same as a contract?

Not by itself. Once signed it may become part of the contract, and then any notices your state requires, such as California's contract terms or Florida's lien notice, need to be included. Check with your licensing board or an attorney.